Infrastructure Investment

Monetize Underutilized Power Assets

We help energy producers and capital partners transform stranded, curtailed, and underperforming power assets into consistent revenue streams through proven computational infrastructure.

2+ GW
Partner Capacity
85-95%
Gross Margins
6-12 Mo
Typical Payback

$20 Billion in Energy Goes to Waste Annually

Grid constraints, transmission limitations, and demand mismatches force energy producers to curtail or flare valuable generation capacity every day.

Curtailed Renewables

Wind and solar generation peaks rarely align with demand. When supply exceeds grid capacity, operators must reduce output—leaving revenue on the table.

1,300 TWh
Curtailed globally in 2023

Flared Natural Gas

Remote production sites lack pipeline access, forcing operators to flare associated gas. This wastes a valuable resource while creating environmental liability.

30%
Of global gas reserves are stranded

Stranded Generation

Remote hydro, geothermal, and legacy power plants operate below capacity due to transmission constraints. Abundant generation has no economic path to market.

$0.00
Value without a buyer

From Stranded Asset to Revenue Stream

1

Site Assessment

We evaluate your stranded capacity, power costs, and site conditions to model the economic opportunity.

2

Deployment

Factory-built, certified modular units arrive ready to connect. Typical deployment in 4-8 weeks.

3

Operations

24/7 remote monitoring and management ensures optimal performance and maximum uptime.

4

Revenue

Regular settlements convert computational output into cash flow for all stakeholders.

"Bitcoin is taking excess energy, storing it into a new form—it's called currency. You take that currency wherever you'd like. So you took energy from one place and now you've transported it everywhere."

Jensen Huang — CEO, NVIDIA

The Only Load That Goes to the Energy

Traditional industrial loads require energy to come to them. Our computational infrastructure is uniquely mobile—it goes where stranded energy exists, converting otherwise worthless capacity into globally tradeable value.

  • Location Agnostic — Deploy at any site with power, regardless of grid connection
  • Instantly Interruptible — Curtail within seconds to support grid stability
  • Scalable Demand — Add or remove capacity in 2MW increments
  • 24/7/365 Revenue — Continuous operation around the clock
  • Certified & Bankable — UL-certified infrastructure enables financing

Illustrative Project Economics

Metric Value
Available Stranded Capacity 10 MW
Energy Cost $0.015/kWh
Containers Deployed 5 units
Annual Energy Cost $1.1M
Annual Gross Revenue $4.2M
Gross Margin 74%

Estimate Your Project Economics

Adjust inputs to model potential returns based on your available capacity and energy costs.

Project Economics Calculator

Configure your scenario

MW
$/kWh
hours
Estimated Annual Gross Revenue
$4.2M
Based on current market conditions
Infrastructure Units
5
Monthly Revenue
$350K
Annual Energy Cost
$1.1M
Gross Margin
74%

Enterprise-Grade Modular Solutions

We partner with leading manufacturers to deploy certified, bankable infrastructure.

Standard

DISRUPTOR® 2000

Air-Cooled Modular Unit
Power Capacity 2 MW
Compute Units 560
Power per Unit 3,400W
Certification UL 508
View Specs

DISRUPTOR® is a registered trademark of RK Mission Critical, LLC. View full product specifications

Deployed Across Multiple Energy Sectors

Wind Farm Curtailment

West Texas wind operators face 5-8% curtailment rates during low-demand periods. Co-located infrastructure absorbs excess generation, creating a revenue floor.

Result: $60M generated from 1.3 TWh curtailed energy (2022)

Flared Gas Monetization

Oil field operators convert waste methane into on-site power. Our infrastructure monetizes stranded gas while reducing emissions by 63% compared to flaring.

Result: 9,482 tons CO2e reduced per MW annually

Solar Peak Monetization

Operate during midday solar peaks when wholesale prices go negative. Combined solar + computational infrastructure achieves payback in 3.5 years vs. 8.1 years alone.

Result: 56% faster project payback period

Stranded Hydroelectric

Remote hydro facilities with limited transmission access can monetize excess capacity on-site. Multiple countries have adopted policies enabling this application.

Typical energy cost: $0.01-0.02/kWh

Let's Evaluate Your Opportunity

Whether you're an energy producer with underutilized assets or a capital partner seeking infrastructure exposure, we provide comprehensive analysis and deployment support.

  • Complimentary site assessment and economic modeling
  • Turnkey infrastructure procurement and deployment
  • Operational management services available
  • Grid services and demand response optimization
  • Flexible partnership and financing structures

Request a Consultation

Your information is kept confidential. We will respond within one business day.